U型槽及平槽工艺施工流程
U型槽及平槽工艺施工流程
Process construction process of U groove and flat groove
1
One
U型槽工艺流程:
U groove process flow:
1.基面清理。
1. base surface cleaning.
2.批益胶泥、粘贴网格布。
2. batch of beneficial glue and stickup mesh.
3.弹线分格,贴泡沫胶带,泡沫胶带选择宽度1.5cm,厚度0.3cm左右。
3. the elastic line is divided into two sections, the foam tape is attached, the width of the foam adhesive tape is 1.5cm, and the thickness is about 0.3cm.
4.批刮第一道腻子,与胶带平齐,待腻子干后,撕去胶带。
The 4. batch scrapes the first putty, flush with the tape. After the putty is dried, tear off the adhesive tape.
5.在第一道腻子的基础上批第二道腻子,把缝批平,接着用直径1.5cm左右的PVC管沿着线槽拉出U型分割槽。
5. on the basis of the first putty, batch second putty, make the seam flat, then pull the U groove with the PVC pipe about 1.5cm diameter.
6.待腻子保养干透后,对U型槽修边打磨,上一道封闭底漆。
6. after the putty is thoroughly dried, the U groove is trimmed and a closed primer is applied.
7.封闭底漆干透后,画黑色或其他颜色的分格线专用漆。
7. after drying the closed primer, draw black or other special color line.
8.将分格线用美纹纸保护好后,上有色底漆。
8. protect the dividing line with beautiful paper, and then use the colored primer.
9.有色底漆干透后,喷中涂主材2遍,及时撕去美纹纸。
9. after drying the colored primer, spray the main material 2 times and tear the beautiful paper in time.
10.罩专用面漆。
10. cover lacquer.
2
Two
平槽工艺流程
Process flow of flush
1.基面清理
1. base surface cleaning
2.批益胶泥、粘贴网格布
2. batch of plaster and sticker
3.批刮腻子2道
3. batches of shaving putty 2
4.待腻子保养干透后,上一道封闭底漆
4. after the putty is maintained and dried, a closed primer
5.封闭底漆干透后,弹线分格,涂刷分格线专用漆
5. after sealing the primer is dry, the elastic line is divided into two parts.
6.粘贴美纹纸,上有色底漆
6. stickout paper, colored primer
9.有色底漆干透后,喷中涂主材2遍,及时撕去美纹纸
9. after drying the colored primer, spray the main material 2 times, and tear the beautiful paper in time.
10.罩专用面漆
10. cover lacquer